WebManginaz • 6 yr. ago. If you're re-doing the drain you might as well run the plywood underneath. It might help stop some of the airflow under the tub which would help keep the tub warmer for a longer time. I've even Batt insulation stuffed around the tub to help retain heat. I don't the 3/4 vs 3/8 has any relevant impact. WebStep 1 – Design the tub. Following the steps explained above, measure your bathroom and decide what shape and size your tub should have. Step 2 – Make the stone tub. Fill the …
Play Tube - Apps on Google Play
WebMar 30, 2024 · The tub measures 48″ L x 32 in wide, so standard 1-piece plastic shower wall kits don’t fit (plus they are ugly!). The photo I have is older, and doesn’t show the framed wall. We have an acrylic tub, so no need to waterproof the floor, but I’m trying to figure out the best way to keep the OSB dry. WebMar 22, 2024 · This is a gut job, all fixtures being replaced. Would it make sense to use purlins then 3/4 plywood to level floor, then place new tub on new plywood? Or backer board & tile entire floor and put tub on top of tile? Can’t … bitumen browser
5 Times to Replace a Subfloor and How To Do It - Bob Vila
WebEnjoy the videos and music you love, upload original content, and share it all with friends, family, and the world on YouTube. WebSep 24, 2024 · Measure the opening and cut a piece of OSB or plywood of the same thickness and dimensions as the subfloor you removed. Test fit it in the hole to be sure that the ends meet on a set of joists. WebSep 20, 2024 · Steps. 1. Decide where you want to place the platform. If you plan to place the hot tub in a location that was previously lawn, you have two ways to do this. [1] The first is to take an 8 foot (2.4 meters) by 8 foot (2.4 meters) section of lawn out and dig down past the sod to undisturbed soil. Then fill the excavation with gravel and level. bitumen cleaning products